Tuesday, 28 July 2009

The Tiles are slowly going on!



I have finally started the tiling in the en-suite! I decided to begin on the wall with the most problems, such as the pipes for the wash basin, the window, and the shower cubicle. Also I will have to relocate the wall cabinet. I am not sure if I want to replace it exactly where it was last time, or perhaps lower it a bit.

I am finding the progress very slow as I have to wait for the adhesive to dry a bit before I can grout between the tiles. So far, I have placed 88 tiles on the wall, and I intend to do another 44 tiles tonight before I call it a day and crawl into bed! I then have just 2 more days to complete this project!!

2 comments:

  1. Tile the whole wall, then grout! And don't let the grout get too dry before wiping it off the tiles, or it'll be there forever!

    ReplyDelete
  2. I just decided to do a bit of grouting to give me a bit of respite from tiling! but I am now pressing on with the rest of the wall, as it is the most complicated!