I have finally started the tiling in the en-suite! I decided to begin on the wall with the most problems, such as the pipes for the wash basin, the window, and the shower cubicle. Also I will have to relocate the wall cabinet. I am not sure if I want to replace it exactly where it was last time, or perhaps lower it a bit.
I am finding the progress very slow as I have to wait for the adhesive to dry a bit before I can grout between the tiles. So far, I have placed 88 tiles on the wall, and I intend to do another 44 tiles tonight before I call it a day and crawl into bed! I then have just 2 more days to complete this project!!
Tile the whole wall, then grout! And don't let the grout get too dry before wiping it off the tiles, or it'll be there forever!
ReplyDeleteI just decided to do a bit of grouting to give me a bit of respite from tiling! but I am now pressing on with the rest of the wall, as it is the most complicated!