At last I have some progress with the en-suite shower room. At least the most important and difficult part of the room has been tiled. Half the room is fully tiled and grouted. Before I went to work, I managed to Plumb back in the toilet cistern, and the sink. The wall cabinet is also installed. I just managed to find time to continue tiling along the other long wall. I think that I should complete the tiling by next weekend.
Then I will have fun trying to install the shower cubicle frame and panels. That is going to require me to start drilling holes on my nice new tiles!!
Finally, I will then connect the shower up, and hope that when I switch it on, the power pump actually works and increases the flow to the shower! If it doesn't, I will have to admit defeat and call a plumber in to fix it!
The final part to this renovation will be to replace the carpet! I have already told my wife that she can choose what she would like. what material she wants it to be, such as linoleum, carpet, cork, or tiles.
Pmt Function In Javascript
1 year ago
No comments:
Post a Comment