Sunday, 9 August 2009

Progress is slow but sure!

At last I have some progress with the en-suite shower room. At least the most important and difficult part of the room has been tiled. Half the room is fully tiled and grouted. Before I went to work, I managed to Plumb back in the toilet cistern, and the sink. The wall cabinet is also installed. I just managed to find time to continue tiling along the other long wall. I think that I should complete the tiling by next weekend.

Then I will have fun trying to install the shower cubicle frame and panels. That is going to require me to start drilling holes on my nice new tiles!!

Finally, I will then connect the shower up, and hope that when I switch it on, the power pump actually works and increases the flow to the shower! If it doesn't, I will have to admit defeat and call a plumber in to fix it!

The final part to this renovation will be to replace the carpet! I have already told my wife that she can choose what she would like. what material she wants it to be, such as linoleum, carpet, cork, or tiles.

No comments:

Post a Comment